Chartered Civil Engineer · 10+ years' experience · Fixed prices, published
Planning · Building regs · Structures

Extension drawings from £250

Everyone else says "get in touch for a quote." Here are our actual prices, right on the front page. Measure your own house and planning drawings are £250, half the usual £500. Want us to measure it? £750. Fixed, in writing, before we start.

Chartered Civil Engineer, 10+ years' experience Fixed price, in writing Fully remote or in person, UK-wide
Checked & approved by a Chartered Civil Engineer
Planning drawings
£250
if you measure your own house
Takes about an hour, we send the guide
The obvious question

"Why is this so much cheaper than the quote I just got?"

Three boring reasons. None of them involve cutting corners on your drawings.

1

You do the measuring

That's the expensive bit: the travel, the parking, half a day on site. Our guide walks you round your own house with a tape measure in about an hour. You save the fee and we save the day.

2

No high-street overhead

No showroom, no sales team on commission. When you message, it comes straight to the engineer. That overhead has to come out of someone's fee, and it's usually yours.

3

Structures done in house

Most drawing firms send the steel and foundation calcs out to an engineer and add a margin on top. Here, the engineer is in house. One team, one invoice, and nobody waiting three weeks on someone else's diary.

Why us

Nobody in this trade shows you a price. We show you ours.

A Chartered Civil Engineer with 10+ years' experience of extensions, conversions and structural alterations, and a number you can see before you've spoken to anyone.

  • Chartered Civil Engineer10+ years' experience designing extensions, conversions and structural alterations. The engineer is the person responsible for what you receive.
  • Fixed price, agreed in writingNo hourly rates. No "that'll be extra." The number you see is the number you pay.
  • Designed in house, checked by the engineerDrawings and calculations produced by our design team, then checked and approved by the Chartered Engineer.
  • You message us, we replyWhatsApp is answered directly. Usually the same working day, often within the hour.
Now viewing: Planning drawings
Most popular
01 · Planning

Planning drawings, measured by you

50% off · was £500£250

You give us the existing plans and tell us what you want to do, and we'll draw it up for you. This option suits people happy to put in a little work taking the measurements, who already know what they want to build. Ideal for a single-storey rear extension or a loft conversion on a typical terraced, semi-detached or detached house.

  • Existing and proposed plans and elevations
  • Site plan and location plan
  • Simple design and access statement, if one is required
  • Permitted development drawings come under this option
  • You submit it yourself, either online through the Planning Portal or by post

Submitting is straightforward. Every council has to accept applications both online and by post, so you can go through the Planning Portal or send your plans and a cheque to the council's address. Double-storey, wrap-around and larger homes are a fixed price agreed once we've seen the scope.

Ask about this →
02 · Planning

Planning drawings, measured by us

Fixed£750

Exactly the same drawing set, except we come out and do the survey ourselves. Worth it for period houses, split levels, anything that isn't square, or if you'd simply rather not.

  • Everything in option 01
  • Full measured survey at your property
  • In person, UK-wide

This price is for a typical terraced, semi-detached or detached house. A ten-bedroom house means measuring everything, so larger or unusual homes are priced individually. The price is still fixed once we've seen the scope.

Ask about this →
03 · Building regs

The full building regulations package

Fixed£1,750

This is the set your builder actually builds from. Planning says whether you're allowed to build it. This says how, and it's the difference between a smooth job and a builder ringing you every morning.

  • Foundation design, sized for your ground
  • Beam and column sizing, with signed structural calculations
  • Insulation build-ups and U-values
  • Your choice of roof: cold roof, warm roof or flat roof, detailed to suit
  • Rafter, joist and lintel sizes
  • Full drawing pack issued to you, so builders can price the job accurately
  • You submit it to the council or a private inspector when you're ready to start

Foundation, beam and column design is already included in this price. We recommend submitting the drawing set as a Full Plans application and waiting for acceptance before work starts, so building control can raise any queries on the detail first. Some builders prefer to start in parallel to save time, which is a decision between you and your builder. For a typical house; larger or more complex builds are a fixed price agreed once we've seen the scope.

Ask about this →
04 · Structures

Beam, column and foundation design

First element£300

Knocking through, taking out a chimney breast, or converting a garage, and building control has asked for calculations? This is the standalone version. Signed calcs, checked and approved by the Chartered Civil Engineer, sized properly for what's sitting above.

  • Steel beams, columns, padstones and lintels
  • Chimney breast and chimney stack removal, with gallows brackets or beam support
  • Garage conversion: lintels, floor and wall build-ups
  • Foundation design and underpinning checks
  • Signed calculation package for building control
  • £150 for each follow-on element
Ask about this →
05 · Drainage

Build over agreement

Fixed£400

Found a manhole in the garden? Building over or within three metres of a public sewer means an agreement with the water company. We do the drawings, the application, and the back-and-forth with their engineers.

  • Drainage drawings and sections
  • Full application pack to the water company
  • We handle their technical queries
Ask about this →
06 · Costs

Bill of quantities

Fixed£500

Buying your own materials and paying labour only? Here's the full take-off: what you need, how much of it, and an indicative cost. It also gives you a straight yardstick to test any builder's quote against, line by line.

  • Measured material quantities from the drawings
  • Indicative costs per item
  • Quantities are firm; material rates move with the market

Available when your planning and building regs drawings are done through us. Already have drawings from elsewhere? Contact us, as the price depends on how much detail they show.

Ask about this →
What's not in the price. Council and statutory fees are paid by you, directly to them, and we never mark them up. On planning that's the householder fee, £548 in England from April 2026, plus the Planning Portal's service charge of about £91. On building regulations it's the building control body's own charge, which varies, plus £21 if it goes in through the Portal. If you want a Lawful Development Certificate, that carries its own council fee: half the householder fee for a proposed certificate, and the full householder fee for an existing one. Then water company fees if there's a sewer, and a party wall surveyor if your neighbour dissents. We'll tell you exactly which ones apply before you commit to anything.
The remote option, explained

You measure. We draw. Nobody has to meet.

People assume remote means worse. It means the survey happens on a Saturday morning instead of a Tuesday afternoon, and you keep the difference. Prefer us on site? That's the in-person option.

01

We send the guide

One page, plain English, with a sketch sheet. It tells you exactly which dimensions we need and which photos to take. A tape measure and your phone is the whole kit list.

02

You spend an hour on it

Room by room, inside and out. Send it back on WhatsApp. We cross-check it against the Ordnance Survey plan and satellite imagery, and make sure what you've sent is enough for us to work from. If anything is missing or doesn't add up, we'll come back and ask.

03

First draft in about a week

Around a week after we have your survey. One round of minor changes is included in the price. Once you're happy, we issue the full pack to you, and submit it on your behalf where your package includes that.

Too awkward to measure yourself? Tell us and we'll be honest about it. Some houses genuinely need a proper survey, and we'd rather do it in person than draw from numbers we don't trust.

Free, no catch

The 27-point checklist we run before any extension drawing leaves our desk

Written for homeowners, not for other engineers. Work through it before you speak to a single builder and you'll know what your project actually involves.

  • Whether you need planning permission at all
  • The four measurements that make or break permitted development
  • Every consent an extension can trigger, and who issues each one
  • The drainage and party wall checks to do before you design
  • What a builder's quote almost always leaves out
  • The paperwork your buyer's solicitor will ask for in ten years

Where shall we send it?

The quickest way is to tap below and it lands in your WhatsApp. You can ask us anything in the same thread afterwards.

OR BY EMAIL

We'll send one PDF with the information. Your details are never sold or shared.

On its way.

Check your inbox, and your junk folder too. Councils and engineers both tend to end up in there. Or download it now.

Start to finish

Six stages, in this order

Most extensions go wrong because these happen out of sequence, like hiring a builder before the drawings exist, or starting on site before conditions are discharged.

  1. 1

    Free feasibility check

    Send us your address and a rough idea of what you want. We check the planning history on your street, whether you're in a conservation area, and whether an Article 4 direction applies, then tell you straight whether it's likely to be permitted development or a planning application. This is a quick eligibility check rather than free design work, and there's no obligation.

    Us · 1–2 days
  2. 2

    Measured survey

    Either you measure with our guide, or we come out and do it in person. Everything we draw afterwards sits on these numbers, so it's the stage worth getting right.

    You or us · about a week
  3. 3

    Planning drawings and submission

    First draft about a week after we have your survey, with one round of minor changes included. Once you're happy, the pack is issued to you, and we submit it through the Planning Portal where your package includes submission. Allow roughly 8–10 weeks overall, since the council runs an eight-week consultation for neighbour comments.

    Us · 8–10 weeks total
  4. 4

    Building regulations package

    The technical set: foundations, steels with calculations and insulation build-ups. We issue it to you, so you can send it to builders to price the job and lodge it with building control yourself as a Full Plans application. Full Plans means the drawings get checked and approved before anyone digs. You choose your council or a private approver, and we answer any technical queries on our drawings.

    Us · 2–3 weeks
  5. 5

    Side agreements

    Runs alongside stage 4, not after it. Party wall neighbours must be notified in good time (two months' notice for a party wall, one month for excavating near their foundations), plus a build over agreement if there's a sewer under you.

    You + us · varies
  6. 6

    Build and sign-off

    Your builder works from the approved drawings. You invite building control to site to inspect at the key stages, and we answer their technical queries. At the end you get the completion certificate, which is the document your buyer's solicitor will ask for one day.

    Your builder · us on call
England · worth knowing

The rules that catch people out

If you only read one section on this page, read this one. It's the stuff people find out too late.

3m

Most extensions don't need planning permission. A single-storey rear extension can go to 3m on a terrace or semi, or 4m detached. Through the prior approval route that rises to 6m or 8m.

1948

"Original house" means as first built, or as it stood in 1948. Whatever a previous owner added has already eaten part of your allowance, and the council knows.

2m

Within 2m of a boundary, eaves can't exceed 3m. This one rule kills more permitted development schemes than everything else combined.

0

Flats and maisonettes have no permitted development rights. Every single alteration needs a full planning application.

40m³

Loft conversions are capped by volume. That's 40 cubic metres on a terrace and 50 on a semi or detached. A dormer facing the highway always needs planning permission.

3m

Build within 3m of a public sewer and you need a build over agreement. Find the manhole before you finalise the design, not after the trench is open.

8wk

The council has eight weeks to decide a householder application. Miss the deadline and you gain a right of appeal.

!

No completion certificate, no sale. Without it a buyer's solicitor treats your extension as though it isn't there, and your sale stalls at the worst possible moment.

If you came from a reel

A quick answer to the things people ask us

Every clip takes on a single planning or building-regs question, answered by the engineer who signs the drawings. It plays straight through, one after the next.

Watch the full library

New reels go up regularly. The player runs through them in order, or jump to any platform below.

Ask away

The questions I get at 11pm

Do I actually need planning permission?

Often not. Most single-storey rear extensions fall under permitted development, which means no planning application, though you still need building regulations approval. Send us your address and a few details on WhatsApp and we'll check your specific property. That check is free, and if you don't need us we'll tell you.

How can this possibly work if you never see my house?

Because a measured survey is arithmetic, not magic. We send a one-page guide and a sketch sheet, you walk round with a tape measure and your phone, and we cross-check what comes back against the Ordnance Survey plan and satellite imagery. We also check that what you've sent is enough for us to work from, and come back to you if anything is missing. If your property is genuinely too awkward for that, such as split levels, a period house that isn't square, or a very tight site, we'll say so and recommend the in-person survey instead.

£250 for planning drawings sounds keen. What am I actually getting?

A complete planning drawing set: existing and proposed plans, elevations, and site and location plans, plus a design & access statement if your council requires one. It's checked and approved by a Chartered Civil Engineer, then submitted through the Planning Portal as your agent. The price is £250 because you do the survey and submit it yourself, and there's no high-street overhead, not because anything is left out. This price covers a typical terraced, semi-detached or detached house. Larger or unusual homes are priced individually and still fixed in writing before we start.

Are you actually a Chartered Engineer?

Yes. In the UK, claiming to be a "Chartered Engineer" (CEng) when you are not registered is unlawful, because it's a protected title rather than a marketing phrase. Everything here is produced by a design team and then checked and approved by the Chartered Civil Engineer, who is the person responsible for what you receive.

What if the council refuses it?

The first thing we do is understand the reason given, because that decides what happens next. Some refusals come down to a detail that can be adjusted; others are about planning policy on your street. We can't guarantee that permission will be granted, and anyone who promises otherwise is selling you something. What we can say is that if things go sideways we're happy to support you, and we'll agree what that involves at the time. Before you commit, we look at what your council has actually approved nearby and tell you up front when a scheme looks marginal.

How long does the whole thing take?

A first draft is usually ready about a week after we get your survey. The council then runs an eight-week consultation on a householder application. Building regs we can turn around in two to three weeks. So from first message to a builder starting on site, plan on roughly three to four months for a straightforward extension.

Do you submit the planning application for me?

It depends on the package. Submitting is straightforward either way. On the £250 option you submit it yourself, either online through the Planning Portal or by posting the documents to the council, and every council has to accept both. On our submitted packages we act as your agent, lodge it through the Planning Portal and handle the case officer's questions. At the payment stage we nominate you to pay, so the Portal emails you a secure link and the fee goes straight from your card to the council. It never passes through us, so there's nothing for us to mark up.

What fees do I pay on top, and who do I pay them to?

On the planning side, the council's householder fee is £548 in England from April 2026. If you submit online there's also the Planning Portal's service charge of £75.83 plus VAT, roughly £91, which you avoid by submitting by post. A Lawful Development Certificate has its own fee: half the householder fee for a proposed certificate, the full fee for an existing one.

On the building regulations side, the building control body sets its own charge, which varies by authority and by the size of the job, and there's a flat £21 including VAT if it goes in through the Portal. All of these are paid by you, directly to them. We'll tell you which apply to your project before you commit to anything.

Who submits the building regulations application?

You do, and that's deliberate. We produce the full package and issue it to you, which means you can send it to builders to price the job and lodge it with building control on your own timeline. It also keeps their fees between you and them, with nothing marked up through us.

Submit it as a Full Plans application rather than a Building Notice. Full Plans means your drawings are checked and approved before anyone digs, which is what you want on anything structural. A Building Notice skips that check, so if something isn't right you find out on site with the work already done.

If building control raise a technical query about something we've drawn, send it to us and we'll answer it. That's included.

Should I use the council or a private building control approver?

Either is fine, and both sign the work off legally and issue the completion certificate at the end. Your options are your local authority's building control team, or a Registered Building Control Approver, which is the private route and used to be called an approved inspector.

Councils are often a little cheaper. Private approvers are often faster and more flexible about inspection times, which matters if your builder is working to a tight programme. Ask both for a price and pick whichever suits the job.

Can my builder actually build from these?

That's the whole point of the building regs package. Insulation build-ups, foundation sizes, steel sections and connections, joist and rafter spans, drainage runs, fire requirements. We issue it to you so your builders can price the job accurately and build it without ringing you every second morning.

Do I need a separate structural engineer as well?

No, that's handled in house. Beams, columns, padstones, lintels and foundations are designed and calculated by our team, then checked and approved by the Chartered Civil Engineer. Most drawing services subcontract this, which is usually where the delays and the surprise invoices come from.

Do you work outside London?

Yes. The remote service works with any local authority in England and Wales, and we've dealt with councils from Cornwall to Northumberland. The in-person survey option is UK-wide.

When do I pay?

Half when you instruct us, half when the drawings are issued. Bank transfer or card. You get a written fee proposal listing exactly what's included and what isn't before either payment.

My builder says I don't need any of this. Is he right?

Occasionally, on genuinely minor work. Usually not. Structural alterations, new drainage, altered openings and anything affecting fire escape are notifiable, and the liability for unapproved work sits with you as the homeowner, not with him. It surfaces when you sell. A call to building control costs nothing and settles it in ten minutes.

I just want a question answered. Is that OK?

Completely. We answer WhatsApp directly and there's no charge for a straight question. Plenty of people message, get an answer and never become clients. That's fine, and it's how the videos pay for themselves.

Portrait
Hello

One Engineer. Ten years. My name goes on your drawings.

I'm a Chartered Civil Engineer in London. For over ten years I've designed foundations, steelwork and structural alterations for house extensions, loft and garage conversions, chimney removals and internal alterations, and produced the planning and building regulation drawings that go with them.

I have a team who help with the design and CAD work, but I'm the responsible person. They work to me, I check and approve everything that goes out, and I deliver what I promised you. When your drawings are issued, my name is on them.

Fixed price, agreed in writing before we start. You'll get a clear fee proposal setting out exactly what's included, so there are no surprises later.

Send us your address and what you're thinking.

Free, no obligation, and usually answered the same day. Photos and back-of-an-envelope scribbles are very welcome. That's how most projects start.

Chat on WhatsApp
WhatsApp Free checklist